พฤศจิกายน 2559 (Trackwork)

- Buffer Stop Type 6ZEB/1 at : Mainline, Track (CB) CH:1+705.171 and Track (CB) CH:2+136.009

- Rail De Stressing at: Mainline, GLEP E23 to P.379 Track (EB)  Track (NB)

- Inspection and Testing Aluminothermic Welding at: Mainline, GLEP E-23 Air Gap

- Punch List Inspection at: Depot, Track (TT) Track (CN1)  Track (PT)  Track (WM)

- Conductor Rail Installation at: Station E22 

- Electric Testing Conductor Rail at: Station E22

- Inspection Spare Parts (Special Tools) at : CK-CT2’s Site Office 

- UT/MT Testing of Aluminothermic  at: Mainline, E23 to Depot 

- Rail De Stressing at: Mainline, GLEPE 23 to P379 

- Inspection and Testing Aluminothermic Welding  at: Mainline, GlEP E23 to P379 

- Slow Bending Test (Aluminothermic Weld for Joint 601 – 800th ) at: KMUTT

- Demonstrate Final Rail Grinding  at : Depot, Track (0SB01) CH:0+115.000 to CH:0+400.000

- Inspection and Testing Aluminothermic Welding at: Mainline, GLEP E15 to E16

- Check Structure Gauge at Mainline, Track (EB) and Track (NB) 

- Demonstrate Final Rail Grinding  at Depot, Track (SB01) CH:0+115.000 to CH:0+400.000

- Conductor Rail Installation  at Mainline, Station E23 to End of (NB:EB) 

- Electric Test Conductor Rail  at Mainline, Station E23 to End of (NB:EB) 

- Inspection of As-Built  at Mainline, Beginning of Project to Station Samrong (E-14 To E-15)

- Inspection Testing MT and UT at Mainline, E15 to E16

- Conductor Rail Installation at Approach to Depot of (AN:AE)

- Electric Testing Conductor Rail at Approach to Depot of (AN:AE)

- Aluminothermic Welding at Mainline, GLEP E15 - Air Gap

- Final Rail Grinding  at Depot, Track (SB04) CH:0+193.000 to CH:0+503.000

- Activity Drilling Check Rail at Mainline, (E19)

- Grinding after De Stressing at Mainline, E14 to E16

- Small Cable Tray Installation  at Mainline, Station E17 to StationE19

- Check Structure Gauge at Mainline, Station E19 (Track EB) To Station E23 (Track EB)

- Grinding after De Stressing at Mainline, E16 to E17

- Inspection and Testing Aluminothermic Welding  at: Mainline, GLEP E-17 Air Gap  Track (EB) CH:4+162.500

- Check Structure Gauge at Depot, Track SB, TT, CN