Get Adobe Flash player
คลังเก็บ
แบบสำรวจ

ความพึงพอใจในการเข้าชมเว็บไซต์ ?

ผลสำรวจ

Loading ... Loading ...

Hit Counter provided by stethoscope reviews

กันยายน 2559 (Trackwork)

- De – Stressing No.19 at Mainline, Track (EB), (E20-E19)

- Aluminothermic Welding  at Mainline, Track (EB), (E20-E19)

- Survey Track Measurement (No.306) at Mainline, Track (EB) CH:5+996.299 to CH:6+098.426

- Pouring Concrete (No.306) at Mainline, Track (EB), CH:5+996.299 to CH:6+098.426

- Survey Track Measurement (No.307) at Mainline, Track (NB) CH:6+106.161 to CH:5+994.229

- Slump Test before Pouring Concrete (No.307) at Mainline, Track (NB)  CH:6+106.161 to CH:5+994.229 

- Pouring Concrete (No.307) at Mainline, Track (NB) CH:6+106.161 to CH:5+994.229 

- UT/MT Testing Aluminothermic  at Mainline, Track (E20-E19), (E20-E21)

- De-Stressing No.21 at Mainline, Track (NB), (E20-E19)  CH:7+312.890 to CH:7+089.000

- Joint Check Structure Gauge Platform at Mainline, Station E15 (SAMRONG)

- Small Cable Tray (Test Track) at Depot, Track (TT) CH:0+017.000 to CH:0+928.500 

- Survey Track Measurement (No.309) at Mainline, Track (EB) CH:6+098.426 to CH:6+193.964 

- Pouring Concrete (No.309) at Mainline, Track (EB)  CH:6+098.426 to CH:6+193.964 

- De-Stressing No.23 at Mainline, Track (EB), (E20-E19)  CH:7+597.110 to CH:7+298.000

 

 

ใส่ความเห็น