Get Adobe Flash player
คลังเก็บ
แบบสำรวจ

ความพึงพอใจในการเข้าชมเว็บไซต์ ?

ผลสำรวจ

Loading ... Loading ...

Hit Counter provided by stethoscope reviews

สิงหาคม 2559 (Trackwork)

- Survey Track Measurement (No.281) at Mainline, Track (EB) CH:8+510.677 to CH:8+622.980

- Survey Track Measurement (No.281-1) at Mainline, Track (NB) CH:2+526.700 to CH:2+571.511

- Pouring Concrete (No.281) at Mainline, Track (EB) CH:8+510.677 to CH:8+622.980

- Pouring Concrete (No.281-1) at Mainline, Track (NB) CH:2+526.700 to CH:2+571.511

- Aluminothermic Welding  at Mainline, Track TO/ML/1017 (CB) CH:1+768.230

- Electrical Testing  at Mainline, Track (EB) CH:0+005.000 to CH:1+532.119  Track (NB) CH:0+004.988 to CH:1+532.106

- Geometry Crossover Turnouts TG 1/14 R300 at Mainline, Track (EB) CH:2+641.353 to CH:2+673.920 (NB) CH: 2+661.164 to CH:2+673.755

- Radiographic Test Samples for Aluminothermic and Flash butt Welded Joint at Mainline, Track (EB) CH:2+694.215 to CH:2+708.151  Track (NB) CH:2+694.122 to CH:2+737.547

- Electrical Testing  at Mainline, Track (EB) CH:0+005.000 to CH:1+532.119, Track (NB) CH:0+004.988 to CH:1+532.106

- ALUMINOTHERMIC WELDING at Mainline, Track (CB) TO/ML/1020 CH:2+083.246, CH:2+086.405, TO/ML/1022 NB CH: 2+110.000

- UT/MT Aluminothermic (No. SKAT. 0497 to 0523  UT = ok,  MT = ok) at Mainline.

- Electrical Testing (Rail) at Mainline, Track (E20-E21)

- De-Stressing  at Mainline, Track (NB), (E20-E21) CH:8+784.860 to CH:9+033.830

- Slow Bending Test for Aluminothermic Welded Joint at KMITT

- Survey Track Measurement (No.297) at Mainline, Track (EB) CH:6+938.322 to CH:7+030.666

- Pouring Concrete (No.297) at Mainline, Track (EB) CH:6+938.322 to CH:7+030.666

- Conductor Rail installation No.6 at Mainline, Track (NB), (EB), (E20-E19)

- Survey Track Measurement (No.298) at Mainline, Track (NB) CH:6+978.320 to CH:7+055.218
Turnout 1/14 R300 TO/ML/1013

- Geometry Crossover Turnouts TG 1/14 R300 at Mainline, Track (NB) CH:6+978.320 to CH:7+055.218

- Electrical Testing Conductor Rail at Mainline, Track (NB), (EB), (E21-E22)

- Joint Inspection Milestone 50% Conductor Rail Installation at Mainline, Track E16

- Survey Track Measurement (No.303-1) at Mainline, Track (NB) CH:9+418.080 to CH:9+483.017

- Pouring Concrete (No.303-1) at Mainline, Track (NB) CH:9+418.080 to CH:9+483.017

- Electrical Testing Conductor Rail at Mainline, Track (NB), (EB), (E22-E23 to depot)

- De-Stressing  No.18 at Mainline,  Track (NB), (E20-E19) CH:8+135.000 to CH:7+910.000

- Aluminothermic Welding at : Mainline, Track (NB), ( E20-E19) CH:7+910.000
(SKAT 05450 SH , SKAT 05451 SH)

- Survey Track Measurement (No.304-1) at Mainline, Track (NB) CH:9+542.649 to CH:9+483.017

- Pouring Concrete (No.304) at Mainline, Track (EB) CH:5+996.299 to CH:5+886.492

- Pouring Concrete (No.304-1) at Mainline, Track (NB) CH:9+542.649 to CH:9+483.017

 

 

 

ใส่ความเห็น