Get Adobe Flash player
คลังเก็บ
แบบสำรวจ

ความพึงพอใจในการเข้าชมเว็บไซต์ ?

ผลสำรวจ

Loading ... Loading ...

Hit Counter provided by stethoscope reviews

กรกฎาคม 2559 (Trackwork)

-

- Survey Track Measurement (No.258) at Mainline, Track (EB) CH:7+649.370 to CH:7+554.198

- Pouring Concrete (No.258) at Mainline, Track (EB) CH:7+649.370 to CH:7+554.198

- ALUMINO THERMIT WELDING at Mainline, Track (EB) CH:0+221.96 Total = 1 joint (SKAT. 0431)

- Magnetic Test and Ultrasonic Test (No.03) at Mainline, Track (EB) CH:0+221.960 and Track (NB) CH:0+234.000

- De-Stressing  at Mainline, Track (EB) CH:221.960 to CH:0+520.660

- ALUMINO THERMIT WELDING at Mainline, Track (EB) CH:0+520.660

- Conductor Rail Installation  at Depot, Test Track (TT)

- Magnetic Test and Ultrasonic Test (No.04)  at Mainline, Track (EB) CH:0+520.660 and (NB) CH: 0+513.169

- Final Grinding Joint (ATW & FBW ) at Depot, Track (TT) CH:0+000.000 to CH:0+943.197

- Alumino Thermit Welding at Mainline, Track TO/ML/1011 RH CH:0+857.000

- Conductor Rail Installation at Depot, line Track (PT)

- Alumino Thermit Welding at Mainline, Track  TO/ML/1012  RH CH:0+867.200

- Electrical Testing at Mainline Track (NB) and (EB)

- Magnetic Test and Ultrasonic Test at Mainline, Track TO/ML/1011 RH CH:0+819.550, TO/ML/1012 RH CH:0+855.905

- Electrical Testing at Mainline, Track (NB) and (EB)

- Geometry Turnout at Mainline, TURN OUT NO. TO/ML/1018 LH CH:1+707.609 to CH:1+745.000

- Conductor Rail Installation  at Depot, Line Track (WS1,WS2,WS3,WS4)

- Joint inspection at Mainline, E16 Puchao Saming Phrai CH:2+422.000 to CH:2+707.000

- De-Stressing  at Mainline, Track (NB) CH:1+357.913 to CH:1+507.810

- Conductor Rail Installation at Depot, Line Track CN3, WS1, PT

- Buffer Stop and Wheel Stop Installation  at Depot, Line Track (TT, PT)

- Geometry Turnout  at Mainline, Turn Out 1/9 R 190 TO/ML/1017

- Survey Track Measurement before Casting Concrete CDM Track (No.17) at Depot, Track (WM) CH:0+167.686 to CH:0+172.686

- Conductor Rail at Mainline, Bearing Station E14 to E15 Track (NB, EB)

- Small Cable Tray Installation Record at Mainline, Station E-15 to Bearing CH:0+000.000 to CH:1+200.000

- Slow Bending Test for Alumino Thermic Welded Joint at KMUTT S-S joint 201th – 400th

- Magnetic Test and Ultrasonic Test  at Mainline, Track (P1-E15)

- Electrical Testing at Mainline, Conductor Rail

- Conductor Rail Installation at Mainline, (E20-E21),  (E21-E22

ใส่ความเห็น