เมษายน 2559 (Trackwork)

- Survey Track Measurement before Casting Concrete Slab Track (No.74)

- Slump Test before Casting Concrete Slab Track (No.74) and Embedded Track  (No.16)

- Slump Test before Casting Concrete Slab Track (No.74) and Embedded Track

- Casting Concrete Slab Track (No.74

- Curing Concrete Slab Track (No.74)

- Survey Track Measurement before Casting Concrete  Embedded Track (No.16)

- Casting Concrete Embedded Track (No.16)

- Curing Concrete Embedded Track (No.16)

- Survey Track Measurement (No.204) at Mainline, Track (NB) CH:3+800.723 to CH:3+890.078

- Pouring Concrete (No.204) at Mainline, Track (NB) CH:3+800.723 to CH:3+882.600

- Survey Track Measurement before Casting Concrete CDM -Q-Track (No.15), Embedded Track (No.18)

- Bracket Bolt For Conductor Rail before Casting Concrete Slab Track (No.75)

- Slump Test before Casting Concrete Slab Track (No.75) and CDM Track (No.14) and Embedded Track (No.17)

- Sampling Flash Butt Weld Joint (6 Samples)  >2-SS (Joint No.19,20) ,>2-SH (Joint No.21,22), >2-HH (Joint No.23,24) (for joint 1501st-2000th)

- Bracket Bolt for Conductor Rail before Casting Concrete Slab Track (No.75)

- Aluminothermic Welding Air Gaps

- Casting Concrete Slab Track (No.75), CDM Track (No.14) and Embedded Track (No.17)

- Curing Concrete Slab Track (No.75), CDM Track (No.14),  and Embedded Track (No.17)

- Electrical Resistivity Test Shear Connector Concrete Slab Track (No.76)

- Pull out Test Shear Connector before Casting Concrete Slab Track (No.76)

- SCCC Continuity Test Concrete Slab Track (No.76)

- Bracket Bolt for Conductor Rail before Casting Concrete Slab Track (No.76)

- Spacing Sleeper before Casting Concrete Slab Track (No.76)

- Aluminothermic Welding at T/O DP NO.2010 RH (T-5) CH.0+022.445 to CH:0+042.249 (PW-03)

- Inspection of Spare Part and Special Tools Onsite (Shim plate, Pan puller , Hand locking device and Rail track gauge )

- Radiography Testing for Aluminothermic Weld Joint (1-200th)

- Geometry Turnouts 1/9 R190 (Turnouts and Crossover TANDAM)

- Aluminothermic Welding at (WS-04) CH:0+102.000

- Pouring Concrete (No.213) at Mainline, Track (EB) CH:2+090.409 to CH:2+056.144 (EB) CH:0+077.229 to CH:0+166.950

- Survey Track Measurement (No.214) at Mainline, Track (EB) CH:0+166.839 to CH:0+283.640