กุมภาพันธ์ 2559 (Trackwork)

- Survey Track Measurement before Casting Concrete CDM-Q Track (No.6) at Depot, Track (PW-3) CH:0+166.880 – CH:0+210.50

- Survey Track Measurement before Casting Concrete Embedded Track (No.11) at Depot, Track (PW-3) CH:0+306.862 – CH:0+210.50

-Slump Test Concrete Embedded Track (No.11) and CDM-Q Track (No.6) (No.11) at Depot, Embedded Track (PW-3) CH:0+306.862–CH:0+   210.500, CDM PW-3 CH:0+210.500– CH:0+166.880

- Curing Concrete Embedded Track (No.11),CDM-Q Track (No.6) at Depot, Embedded Track

- Curing Concrete Embedded Track (No.11), CDM-Q Track (No.6) at Depot, Embedded Track PW-3 CH:0+306.862 – CH:0+210.500

- Spacing Sleeper before Casting Concrete at Depot, Track (PT) CH:0+919.699 – CH:0+980.266

- Survey Track Measurement (No.156) at Mainline, Track (NB) CH:8+811.987 – CH:8+896.974

- Pouring Concrete (No.156) Mainline, Track (NB) CH:8+851.650 – CH:8+896.974

- Activity at Zone 3/2-2 (T02,T03)

- Handing Over Working Area C1 to C2 From P1 to P199

- Bracket Bolt and Shear Key Mainline, Track (EB) CH.8+765.770 – CH.8+691.900

- Survey Track Measurement (No.161) Mainline, Track (EB) CH:8+765.770 – CH:8+678.468

- Alumino Thermic Weld T/O No.2014 RH (T-9) CH:0+663.849 (SB4)

- Conductor Rail Installation Depot, Track (SB-01-SB04) CH:0+403.153 to CH:0+183.235

- Track Measurement (No.166) Mainline, Track (EB) CH:2+317.473 to CH:2+224.373

- Bracket Bolt and Shear Key (No.166) Mainline, Track (EB) CH.2+224.373 to CH.2+317.473

- Pouring Concrete (No.166) Mainline, Track (EB) CH:2+298.010 to CH:2+225.920

- Survey Track Measurement before Casting Concrete CDM-Q Track (No.9) Depot, Track (CDM), (PW-1) CH:0+116.835 to CH:0+059.157

- Casting Concrete CDM-Q Track (No.9) Depot, Track CDM (PW-1) CH:0+116.835 to CH:0+059.157

- Curing Concrete CDM-Q Track (No.9) Depot, Track CDM (PW-1) CH:0+116.835 to CH:0+059.157

- Track/Turnout to Earth Resistance Test Depot, Track (SB-04), (T-11) CH:0+663.420 to CH:0+613.618

- Inspection Rail TO Rail Insulation Resistance Test Depot, Track (SB-04), (T-11) CH:0+663.420 to CH:0+613.618

- Conductor Rail Installation Depot Track (SB-01), Track (SB-04)

- Spacing Sleeper before Casting Concrete Washing Plant Track (No.1) Depot Track (WM) CH:0+269.318 to CH:0+203.106

- Survey Track Measurement before Casting Concrete Slab Track (No.63) and Washing Plant Track (No.1)  Depot, Track (WM)

CH:0+172.686 to CH:0+203.106 (WM) CH:0+269.318 to CH:0+203.106

- Casting Concrete Slab Track (No.63)  and Washing Plant Track (No.1) Depot, Track (WM) CH:0+172.686 to CH:0+203.106 (WM) CH:0+269.

- Curing Concrete Slab Track (No.63)  and Washing Plant Track (No.1) Depot, Track (WM) CH:0+172.686 to CH:0+203.106 (WM) CH:0+269.318 to CH:0+203.106

- Alumino Thermic Weld Depot, Track (T-10), (SB02) CH.0+545.000 to CH.0+565.000

- Running Rail/Turnout Continuity Test Depot, Track (SB-04), (T-11) CH:0+663.420 to CH:0+613.618 and (T-09) CH:0+663.849 to CH:0+644.047

- Survey Track Measurement (No.173) Mainline, Track (EB) CH:2+708.151 to CH:2+763.876