มกราคม 2559 (Trackwork)

- Survey Track Measurement before Casting Concrete, Slab Track, CDM Q-track (No.48) -at Depot, Track (WS-01), (WS-03)

- Slump Test Concrete, Slab Track and CDM Q-track at Depot, Track (WS-01), (WS-03)

- Casting Concrete Slab Track and CDM  Q-track at Depot, Track (WS-01), (WS-03)

- Curing Concrete Slab Track and CDM Q-track at Depot, Track (WS-01), (WS-03)

- Survey Track Measurement (No.147) at Mainline, Track (EB) CH:9+533.101 – CH:9+601.577

- Check Resistivity of Shear Connector at Mainline, Track (EB) CH.9+601.577 – CH:9+533.101

- Test SCCC at Mainline, Track (EB) CH.9+570.000 – CH.9+533.101

- Final inspection for Pouring (No.147) at Mainline, Track (EB) CH.9+601.577 – CH:9+533.101

- Pouring Concrete (No.147) at Mainline, Track (EB) CH:9+533.101 – CH:9+601.577

-Survey Track Measurement before Casting Concrete Slab Track (No.49) at Depot,  Track (WS-02),(WS-04), (T-23 turnout 1/6 R100 (RH) No.TO/DP/2019),(T-24 turnout 1/6 R100 (LH) No.TO/DP/2061)

- Bolt For Conductor Rail before Casting Concrete Slab Track (No.49) at Depot, Track (WS-02),(WS-04),(T-23 turnout 1/6 R100 (RH) No.TO/DP/2019),(T-24 turnout 1/6 R100 (LH) No.TO/DP/2061)

- Slump test Concrete Slab  at Depot, Track (WS-02), (WS-04), (T-23 turnout 1/6 R100 (RH) No.TO/DP/2019), (T-24 turnout 1/6 R100 (LH) No.TO/DP/2061)

- Casting Concrete Slab Track (No.49) at Depot, Track (WS-02),(WS-04), (T-23 turnout 1/6 R100 (RH) No.TO/DP/2019), (T-24 turnout 1/6 R100 (LH) No.TO/DP/2061)

- Curing Concrete Slab Track (No.49) at Depot, Track (WS-02), (WS-04), (T-23 turnout 1/6 R100 (RH) No.TO/DP/2019), (T-24 turnout 1/6 R100 (LH) No.TO/DP/2061)

- Electrical Resistivity Test Shear Connector Concrete Slab Track (No.50) at Depot, Track (WS-03) (PW3),  (CN2) (T-06 turnout 1/6 R100 (RH) No.TO/DP/2016)

- Pull Out Test Shear Connector Concrete Slab Track (No.50) at Depot, Track (WS-03) (T-06 turnout 1/6 R100(RH) No.TO/DP/2016) (PW3), (CN2)

- Check Spacing Sleeper at Mainline, Track (NB,EB) CH:9+285.094 – CH:8+582.185

- Spacing Sleeper and Bearers before Casting Concrete Slab Track (No.50) at Depot, Track (WS-03) (PW3),(CN2) (T-06 turnout 1/6 R100 (RH)  No.TO/DP/2016)

- SCCC Continuity Test before Casting Concrete Slab Track (No.50) at Depot, Track (WS-03) (PW3) , (CN2) (T-06 turnout 1/6 R100(RH) No.TO/DP/2016)

- Geometry Turnout (No.06) before Casting Concrete  Slab Track (No.50) at Depot, Track (WS-03) (PW3), (CN2) (T-06 turnout 1/6 R100(RH)     No.TO/DP/2016)

- Survey Track Measurement (No.149) at Mainline, Track (NB) CH:9+165.171 – CH:9+080.885

- SCCC  at Mainline, Track (NB) CH.9+160.000 – CH.9+053.000

- Pouring Concrete (No.149) at Mainline, Track (NB) CH:9+165.171 – CH:9+080.885

- Activity Installation Conductor Rail at Depot, Stabling track at SB-01 to SB-04

- Activity Depot at Zone3/2-2  at Track (PT, T01)

- Activity Depot at Zone3/2-2 Permanent way at : Track(PW)

- Inspection of Spare Part and Special Tools Onsite at Project Bearing – Samutprakan Section Contract 02

- Install Conductor Rail SB01, SB02, SB03, SB04 at Depot CH:150.876 – CH:403.02,  CH:115.705 – CH:436.65, CH:85.706 – CH:406.65,

CH:183.405 – CH:504.533

- Activity Installation Conductor Rail at Depot, Stabling track at SB-01 to SB-04

- Curing Concrete Slab Track (No.52) at Depot, Track (PW-1) CH:0+007.307 – CH:0+059.157 (PW-2) CH:0+000.000 – CH:0+022.264

(T-04 1/6 R100 LH No.TO/DP/2057)

 