Get Adobe Flash player
คลังเก็บ
แบบสำรวจ

ความพึงพอใจในการเข้าชมเว็บไซต์ ?

ผลสำรวจ

Loading ... Loading ...

Hit Counter provided by stethoscope reviews

ธันวาคม 2558 (Trackwork)

- Survey Track Measurement (No.131) at Mainline, Track (NB) CH:10+371.308 – CH:10+439.733

- Electrical Resistivity Test Shear Connector before Casting Concrete Test Track (NO.10) at Depot, Track (TT) CH:0+356.742 – CH:0+287.100

- Pouring Concrete (No.131)At Mainline,  Track (NB)  CH:10+371.308 – CH:10+439.733

- Survey Track Measurement before Casting Concrete Test Track (No.09) at Depot, Track (TT) CH:0+356.742 – CH:0+427.100

- Slump Test Concrete Test Track (No.09) at Depot, Track (TT) CH:0+356.742 – CH:0+427.100

- Curing Concrete Test Track (No.09) at Depot, Track (TT) CH:0+356.742 – CH:0+427.100

- Survey Track Measurement (No.132) at Mainline, Track (NB) CH:10+371.308 – CH:10+302.220

- Bracket Bolt Mainline, Track (NB) CH.10+371.308 – CH.10+316.820

- Shear Key at Mainline, Track (NB) CH.10+371.308 – CH.10+316.820

- SCCC  at Mainline, Track (NB) CH.10+334.040 – CH.10+311.010

- Pouring Concrete (No.132) Mainline, Track (NB) CH.10+371.308 – CH.10+316.820

- SCCC Continuity Test before Casting Concrete Test Track (No.10) at Depot, Track (TT) CH:0+356.742 – CH:0+286.742

- Survey Track Measurement (No.133) at Mainline, Track (EB) CH:10+506.760 – CH:10+434.261

- Pouring Concrete (No.133) at Mainline, Track (EB) CH:10+502.210 – CH:10+434.261

 

ใส่ความเห็น