Get Adobe Flash player
คลังเก็บ
แบบสำรวจ

ความพึงพอใจในการเข้าชมเว็บไซต์ ?

ผลสำรวจ

Loading ... Loading ...

Hit Counter provided by stethoscope reviews

ตุลาคม 2558 (Trackwork)

- Survey Track Measurement  Embedded Track  (Pre- Concreting No.03)

- Slump Test Concrete Embedded Track (No.03)

- Casting Concrete Embedded Track (No.03)

- Inspection Curing Concrete  Embedded Track  (No.03)

- SCCC Continuity Test before Casting Concrete Slab Track (No.39)

- Spacing Sleeper before Casting Concrete Slab Track (No.39)

- Survey Track Measurement (No.84)

- Bracket and Pre Concrete

- Pouring Concrete (No.84) at Mainline, Track (EB) CH:11+734.482 – CH:11+668.635

- Bracket and Pre Concrete at Mainline, Track (NB) CH.11+815.735 – CH.11+756.930

- SCCC and Shear Key at Mainline, Track (NB) (Loop 1) CH.11+710.000 – CH.11+650.000

- Survey Track Measurement (No.87)

- Pouring Concrete (No.87) at Mainline, Track (NB) CH:11+695.993 – CH:11+756.930

- Demon State CDM-Q Track at Depot, at Alstom Site Office

- Survey Track Measurement (No.89) at Mainline, Track

- Demon State CDM-Q Track  Depot, at Alstom Site Office

- Survey Track Measurement  Embedded Track  (Pre- Concreting No.01)

- Slump Test Concrete Embedded Track (Concreting No.01)

- Casting Concrete Embedded Track  (Concreting No.01)

- Curing Concrete  Embedded Track (Concreting No.01)

- Casting Concrete Embedded Track  (No.01-FINAL)

- Demon state CDM-Q Track at Depot, at Alstom site office

ใส่ความเห็น