กรกฎาคม 2558 (Trackwork)

- Survey Track Measurement (No.07) at Mainline, Track (EB) CH.4+765.408 to 4+714.201

- Site Inspection at Depot, Track WS-07 to WS-08 (Main Workshop)

- Bracket for Conductor Rail Mainline, Track EB.CH.4+765.000 to CH.4+815.000

- Pull Out Test Shear Connector (No.25) at Depot, Track WS08 CH.0+010.000 to CH.0+080.000

- Casting Concrete Slab Track (No.9) Mainline, (NB) CH.4+641.488 – 4+677.744

- Final Brackets Bolt at Mainline, Track (NB) CH.4+677.800 -4+721.925

- Check Spacing Brackets Vertical, Horizontal at Mainline, Track (NB) CH.4+721.952 – 4+756.400

- Check Spacing for Sleeper at Mainline, Track (NB) CH.4+746.949 – CH.4+860.331

- SCCC Continuity Test before Casting Concrete Slab Track (No.25) at Depot, Track WS08 CH.0+010.000 to CH.0+080.000

- Spacing Sleeper before Casting Concrete Slab Track (No.25) at Depot, Track WS08 CH.0+010.000 to CH.0+080.000

- SCCC Continuity Test at Mainline, Track (NB) CH.4+801.640 to 4+851.400

- Positive Bending Moment at Rail Seat at Thai Picon Factory, Saraburi

- Fastening Insert Pull Out Test at Thai Picon Factory, Saraburi

- Dimensional Check at Thai Picon Factory, Saraburi

- Test Cubes at Thai Picon Factory, Saraburi

- Check Bracket Bolt at Mainline, Track (NB) CH.4+805.949 to

CH.4+860.331

- Curing Concrete Slab Track at Depot, Track WS08 CH.0+015.899 to CH.0+076.941

- Electrical Resistivity Test Shear Connector (No.26) at Depot, Track WS07 CH.0+075.000 to CH.0+153.000

- Slump Test Concrete Slab Track of Depot, Track WS07 CH.0+092.154 to CH.0+147.564

- Witness Slow Bending Test for Flash Butt-Welding Cover 500 joints at Chulalongkorn University,  Civil Engineering Lab

- Casting Concrete Slab Track (No.18) at Mainline, Track (NB) CH.4+851.400 to CH.4+896.690

- Pull Out Test Shear Connector (No.27) at Depot, Track WS07 CH.0+030.000 to CH.0+060.000

- Spacing Sleeper before Casting Concrete Slab Track (No.27) at Depot, Track WS08 CH.0+005.000 to CH.0+015.000 and WS07 CH.0+030.000 to CH.0+090.000 (Turnout No.T-20)

- Survey Track Measurement (No.20) at Mainline, Track (NB) CH.4+952.793 to CH.5+006.669

- Bracket Conductor Rail  at Mainline, Track (NB) CH.5+006.669 – CH.5+060.622

- Survey Track Measurement (No.21) at Mainline, Track (NB) CH.5+060.622 to CH.5+006.669

- Information Ultrasonic Testing Flash Butt Welding at Depot

- Witness Ultrasonic Testing (Pre-Production Thermit Welding) at Alstom Yard

- Determination of Toe Load Test at Track  in Depot Area

- Mobilization Turnout 1/6 R100 at Depot, Track  Turnout  T-06, T-16, T17 and T18

                  